Answer / sumeet rathod
1.for 1 sq/m slab reqired = 2span @ .600c/c
2.for beam support vertical iron props are required always, 1st prop kept from column at a distance of .230 and than .600 c/c
| Is This Answer Correct ? | 8 Yes | 5 No |
WHAT IS THE IMPORTANCE OF FLY ASH BRICK?
Which code is used for tor & tmt steel bar?
What is the actual consumption of bindingwire Per MT for multi-storied housing construction
what is mean by bPo in construction? pls tell me
what are the differences between Tie beam, Ground beam and strap beam. thanks
how to calculate width and thickness of columns and beams for differnt area with example
Wats the purpose of lap length? Is it for strength or increasing of span
What is the difference between Autodesk revit structure and STAAD pro.? How much it is useful to structural engineer in modelling, analysis & design of RCC and Structural steel structures than STAAD pro.?
How Many Brick in One Cubic Meter.
when does sedimentation occur before filteration, along with it, along with chlorination, after chlorination?
1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 + 1 + 1 x 0 = answer??? pzl tell the rite answer ??
What is the difference between opc cement to ferro cement
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)