Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how pressure reduce through pressure control valve? suppose
we have to reduce 20 kg pressure to 10 kg pressure , then
what we do ? open the valve or close the valve , initially
it is 20 % is upon ( for ur knowledge ).

Answers were Sorted based on User's Feedback



how pressure reduce through pressure control valve? suppose we have to reduce 20 kg pressure to 10 ..

Answer / senthil r.m

My dear,
In control valve we ll compare the setpoint(operator interference value) and the actual pressure on the line.this deviation is given to the control valve.When the error is positive(means pressure is high),the C/V starts closing and when the error is negative(means pressure is low),the C/V opens and maintains the pressure.
One more thing,why u need to fix the low limit of control valve to open 20%.Depending on the deviation the controller controls the process pressure.
Finally,the controller tuning is must for this control.play with the gain and integral time and deadband to make steady process..

Is This Answer Correct ?    4 Yes 0 No

how pressure reduce through pressure control valve? suppose we have to reduce 20 kg pressure to 10 ..

Answer / daxish_02

If pipe size is same before and after so this answer is correct..
basic fundamental behind the general formula that is
pressure=force/area......ok
here pipe size is fixed...ok
assume 20% valve open....than area of pipe cover after the valve is more so we get some pressure..
assume that valve open 40% so area of material flowing through valve increase so pressure decrease after the valve.....

Is This Answer Correct ?    2 Yes 1 No

how pressure reduce through pressure control valve? suppose we have to reduce 20 kg pressure to 10 ..

Answer / ashraf

First, know where the valve is.If it is at upstream,(High
pressure line to vessel), then close valve and open vent
valve till pressure reduces to 10 kg. If it is at
Downstream,open the valve.

Is This Answer Correct ?    1 Yes 1 No

how pressure reduce through pressure control valve? suppose we have to reduce 20 kg pressure to 10 ..

Answer / g.s.arun

to open the byepass valve ,to reduce the pressure 20kg to 10 kg.

Is This Answer Correct ?    1 Yes 4 No

Post New Answer

More Instrumentation Interview Questions

Speedtronic system .

0 Answers   CCIE,


how can I install "operating system " in may HART communicator? It is damaged, and it doesn't boot up.

1 Answers   ARPC,


How does electro magnetic pump works ?

1 Answers   IGCAR,


what is the difference b/w magnetic flow meter&mass flow meter? which one is best?

1 Answers  


What is the Difference between CNC and PLC

1 Answers  


What is the principle of a Pressure gauge?

2 Answers   CCIE,


What is cavitation. what is the effect of it on control valve and how is it prevented.

1 Answers   ADMA OPCO,


What is the difference between compensation and extension cable.

11 Answers   HPCL,


please tel me the calibration of pneumatic controler.

0 Answers  


How to change dcs card in online. (Dsc is maxdna)

0 Answers  


A DP transmitter is used to measure the level of an open tank. The drain line of the tank is connected to a control valve, and is configured as, if the level of the tank is 90% the valve should get open 10%. And if the tank level is 10%, the valve should get open 90%. Draw wiring diagram and explain how to configure DP transmitter and control valve using HART communicator. If the span error at output is 1%, what will be the %opening of the control valve at 60% level of the tank?

0 Answers  


I am working in a process industry, in that there are several sections devided in the SCADA screens and individual sections may START independently. But sometimes i am facing problem i.e, if section 2 Stopped by the operator immediately Section 1 or Section 3 or Section 4 is getting stopped can you expain the reason behind this?

5 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)