how many no of light weight solid blocks of size 600x200x200mm
required for 1cum of block work
Answers were Sorted based on User's Feedback
Answer / amit
first of all mortar quantity has to be calculated.
it comes b/w 15% to 17.5% of total block work.that means 0.15 cubicmeter to 0.175cum.therefore
Actual quantity of Blocks required=1-0.15=0.85cum
hence Nos of blocks=0.85/(0.6x0.2x0.2)=36 blocks
2 to 3% wastege= 1 blocks
thus total quantity=36+1=37 blocks
Is This Answer Correct ? | 1 Yes | 1 No |
Answer / v nagarur
1cubic meter/volume of cube gives us number of bricks,so, for,
600*200*200
1/0.6*0.2*0.2=41.66=42bricks
Is This Answer Correct ? | 1 Yes | 2 No |
Answer / amit
after considering mortar quantity & wastage=40 blocks
Is This Answer Correct ? | 0 Yes | 1 No |
Define What is a projection line?
1- what is steel rebar cover? 2- what is a rebar stirrup?
what is the difference between natural draught cooling tower and induced draught cooling tower
Can we use PPC AND PSC CEMENT FOR MIX DEIGN?
1 Answers IVRCL, Reward Constructions,
what is C50 expressed in kg/m3
Which word is coolest among the 26 alphabets?
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
what is the % wastage of cement in rcc
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
Where is the worlds longest elevator and how long is it?
which is the cheapest type of temporary flooring(say for using 6 months on)?
How do we calculate the power of centrifugal pump?