rate analysis for shuttering 1:6
Answers were Sorted based on User's Feedback
Answer / sjtbehera
what is mean by shuttering 1:6
shuttering are measure by sqm or sqft.
anyalisis can be done by taking plywood, support ( Bolly)
and batten
| Is This Answer Correct ? | 10 Yes | 0 No |
How do you calculate load bearing capacity of a waffle slab?
what is the specific gravity of rubble in plum concert
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
In built up area basis what is ratio of concrete
how much need sand and cement for 1 cft roof construction?
0 Answers Indus Valley Construction IVCC,
In which code the the maximum height of concrete casting has been explained
How can i design the beam . Explain with one example
can i place column steel lapping in floor beam? my lapping is 24 inches in floor beam and 24 inches on floor beam
what is right & short method of measurement of slab&beam
in m25 concrete what is m.
How much snowcem required per sq. Meter area
3 Answers Bhushan Power Steel,
The place Chakri Dadri which was recently in news in located in______ place? A) Uttar Pradesh B) Uttarakhand C) Rajasthan D) Haryana
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)