What is LSIG ?
Answers were Sorted based on User's Feedback
Answer / fowzan
L -Protection against overload with long inverse time-delay
trip
S -Selective protection against short-circuit with short
inverse or defi nite time-delay trip
I -Protection against instantaneous short-circuit with
adjustable trip current threshold
G- Protection against earth faults
| Is This Answer Correct ? | 194 Yes | 3 No |
Answer / sham
LSIG protection means overload, short circuit,instantaneous
and ground fault
| Is This Answer Correct ? | 90 Yes | 24 No |
Answer / pari
LSIG = Long-time + Short-time + Instantaneous + Equipment Ground-fault Protection
| Is This Answer Correct ? | 51 Yes | 6 No |
Answer / sagar
i its LONG SHORT INSTANTANEOUS GROUND..... so nxt time be
care ful dude
| Is This Answer Correct ? | 42 Yes | 28 No |
Answer / prabu a r
L- long time stands for over load protection time delay settings.
S- short time stands for short circuit time delay settings.
I- instaneous stands for instaneous short circuit time delay settings.
G- ground stands for earth fault time settings
| Is This Answer Correct ? | 6 Yes | 0 No |
Answer / sivaji
L-LINE TO LINE
s-short circuit
i-overload curent
g-ground fault
| Is This Answer Correct ? | 3 Yes | 70 No |
Do you know how to measure the earth resistance?
defination of transistor controlled series capacitor
why stator winding of synchronous machine are connected in star connection ?
Tesla is the unit of which parameter?
In track electrification Either we use single conductor or double conductor? why?
In case of legging current of 20°, pf is .94 and leading of 20°,pf is .94 , in mathematicaly both are same but in realy how it is differ ?
Please let me if star point(Nutral) of Delta/ Strar transformer, in 4wire (TPN+E) is tobe gruonded seperatly,inaddition to LV Panel earthing????
WHY THREE PHESE SYSTEM VOLTAGE APPLIED IN 440 VOLT
What are the different methodes for calculating the short circuit Current?
how we can check the CT & VT?
different aspects of voltage stability
Dear all: Recently we got a question about Interface between PMS and SAP-PM.once we got a update message from PMS.we should set the deletional flag for functional location in SAP system.Is there any FM or BAPI to use?There are only functional location create and change provided by SAP. Best regards!
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)