why grid frequency varry time to time?
Answers were Sorted based on User's Feedback
Answer / satendra
when the demand is more on grid and generation is less frequency get decreased and vise - vers.
so in order to maintain this near to 50hz grid gave a schedule to power generating station of 15-15 min. for 24 hour's in advance ( prediction on the basis of previous records )
satendra.svnit@gmail.com
| Is This Answer Correct ? | 3 Yes | 1 No |
what is the potential of 11kv A.B.Switch
how the diesel generator maintain the rpm when the generator loaded varies from 10% to 70% immediately?
If two transformers same rating(11KV / 440V)connected in the same primary line(11KV), can we connect(bus coupler) secondary side directly or need a synchronization????
How to calculate voltage drop in copper and aluminium cable? I have laid 240Sq.mm Aluminium cable for the length of 600 Mtrs in 1 Mtrs underground. Normal load is 150A. Transformer is 630KVA, 6.KV/433V. But, I am getting only 395 Volts when load. How to calculate voltage drop and what is the permissible voltge drop for this circuit?
1.What is effect of capitance in transmission line? 2. After raising the voltage at receiving end what will be happen? 3.how we nullify or control the raised voltage at receiving end?
Between Turbo alternator and Hydro alternator which one is more difficult to cool and why?
what is the main purpose of line PT and bus PT?
in our 6.6kv motor feeder[it is having two sources from Bus A&B] earth fault relay is acting, we checked CBCT connection and cable meggerd values found very good still earth fault acting during first two are three start after that it will hold. please clarify what was the reason. if same motor is starting from other Bus-A it will start.
Is VVVFD reduced the starting current of an induction motor?
If the line voltage is reduced to 75% of its rated value then by what percentage current will reduce ?? 75% 25% 50% no change and why ?
What is the types of HT motor testing
A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)