1. How do you handle non-productive team members?
Answers were Sorted based on User's Feedback
Answer / bala
*Need more information.
1.R u on their side like one of the team member, r
2.R u the one to lead them, r
3.R they opponent 2 u (like Site.Eng Vs QC.Eng ).
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / m.a.muqtadar
1. Trained them
2. Encourage them
3. Supervise them
4 Keep him under observation of a skilled foreman
5. Be committed to them.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / venkata appa rao
I am tackling this question as if your are the team lead.
1. Asses his strengths and weaknesses.
2. Asses his present condition is due to demotivation, lack of motivation or inadequate motivation?
3. Is he not able to fit into this team or there is a temporary slump in his Performance.
4. sit with him and counsel him about his performance or lack of it.
5. If after all this he does not come up in performance change his duties after ascertaining about his aptitude.
6. Counsel him as to how and why of his present inadequate performance.
Is This Answer Correct ? | 1 Yes | 0 No |
1.we have to observe them initially 2 test their grasping
power 3 explain them n number of times ask and enquire where
they are lagging behind 4 give ample of time 5 finally
insist them to do lastly maintain principle perform or perish
6 telling him he will be rewarded for his work and deication
Is This Answer Correct ? | 0 Yes | 0 No |
what is escalation?how it is done?
how to calculate the chair reinforcement length in slabs, footing or anywhere??
rimmer in pile foundation
What is gauge and gage
human blood is newtonian or non- newtonian fluids
Define Chimney in Thermal power plant?
what is features of a typ-ical modern air-conditioning installation?
what is the depth of a pile foundation??density of wood?? nominal mix ratios for different grades of concrete? effect of earthquake on structures? bending moment and shear force diagrams and also learn to find out the deflection..how is under water concreting done??
how to calculate steel quantity of column from steel design
Explain the difference between shear and tensile strength.
How to calculate the quantity of cement,sand,aggregate for the area L*B*T are 15.24 m*21.36m*0.12m in the ratio 1:2:4 can any ine explain in detail by using formulas. Thanks in advance
Lime used for white washing is- (1) quick lime (2) Hydrated lime (3) caustic lime (4) lime milk