Answer / bong/mustafa
r.c.c roof slab given = 25*20,
25ft=m/3,28ft=7,62*6.097= 46.46 m2
vol = 9.28 = 10 bags =
= 20 cub =
= 40 cub =
| Is This Answer Correct ? | 68 Yes | 27 No |
Answer / soumya
rate of M20 concrete per cum= Rs.2900
labour charge=250 rs
shuttering cost=300
total =2900+250+300=3450/cum
here area given as =25*0.3048*20*0.3048=46 sqm
assume roof thickness as 10 cm
there for Qty =46*0.10=4.6 cum
cost of rcc roof =4.6*3450=15870
| Is This Answer Correct ? | 55 Yes | 29 No |
Answer / dharmaraja mk
Concrete slab area = 25' x 20'
= (25x.3048)x (20x.3048)
= 7.62 x 6.096
= 46.451 Sqm
The IS CODE is recommended the minimum roof slab thickness is 125mm.
= 46.451 x .125
= 5.806 CUM
The RMC rate approximate 3000/cum.
Labour Mason-3no, mc-4no
= (3x500)+(4x350)
= 2900
Concrete coste = (5.806x3000) + 2900
RS = 20319
If it is not calculate for Shuttering cost.
| Is This Answer Correct ? | 37 Yes | 15 No |
Answer / muzaffar hussain
roof concrete size width 40 feet length 53 feet(plz send me estimate stone quantity & size sand cement and labor charges
| Is This Answer Correct ? | 6 Yes | 0 No |
Answer / lalit kumar sharma
i want to do a rcc slab 19*19 how much total all cost, iron, sand, dust rodi, cement
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / kage
All given answers are thumb rules . No body has calculated from basics. This is the reason they are converting the sizes in to metric. because the thumb rules available with them are in metric sizes.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / gokul
I want build water tank in rcc, size L-20ft x B-17ft x H-12ft. Wall thickness 0.75ft. Please give construction price.
| Is This Answer Correct ? | 0 Yes | 0 No |
How to calculate strirubs hook length? one of my friend said unit of steel*dia of steel*no of bend=hook length is correct r wronge
name three materials used in drainage work
Lap length may different for FE 415 and FE 500 Steel, If different what is the different, In which code is mentioned
quick sand is a type of sand flow condition occuring in cohesive soil flow condition occuring in cohessionless soil all above
what is meant by workebility of concrete?i have studied about it much but i can't clear about it.so plz give me a detail explanation in simple english or urdu ?
Specific gravity of cement?
If your drg told used 600 dia hume pipe for culvert but due to market problem available 300 dia hume pipe,den how much humepipe you provide(300 dia) instead of 600 dia?
How to calculate the quantity of water in cement mortar eg. CM 1:3?
how much steel required for 1 sq.m area?
24 Answers AA Architects, L&T,
what is the average steel consumption in multy storey building as a residential and commercial?
what is the compresive strength of m20 concrete at 7 day
M20 Grade ratio? M30 Grade ratio? M40 Grade ratio ?
30 Answers AB Group, Aparna Enterprises, CECL, Engineers India, intex, Jain Group, Keystone, L&T, Multi Engineering, National, Shrinath Buildcon,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)