What is plant load factor?
Answer / karthikeyan
"Load Factor" is an indicator of how steady an electrical
load is over time.
If your electric billing rate includes both an Energy (kWh)
and Demand (kW) charge, your load factor can be calculated
by the following formula:
L.F. (percent) = [(Total kWh)/(# Days in Bill Cycle x 24
hrs/day)]/[Peak kW Demand]
If your load factor is low, you should look for ways to
even out your electrical usage (i.e., shift energy
intensive processes to periods of otherwise low usage).
By increasing load factor, you will reduce the impact of
monthly demand (kW) charges on your bill.
LF = average demand / peak demand
for a given period of time.
| Is This Answer Correct ? | 15 Yes | 9 No |
What are carvings in Ajanta Caves? a.Mahabarath b.Ramayana c.Jataka Tales d.Upanishads
CATIA V5 INTERVIEW QUESTONS IF ANYBODY HAVING PLEASE SEND ME LINK
efficiency of diesel generator set:kwh x 3410 x 100/ fuel in ltrs x 0.87 x 2.2 x 19000. is it correct formula
What is the critical temperature of a refrigerant ?
QUSETION PAPERS SOLVED FOR THE LAST 4YEARS RRB EXAMS
how to calculate heat? i.e one glass water heat how much kelvin?
1 Answers AVT Natural Products,
What are the criterias for selecting piping for different utilities services like cooling water, DM Water, Service Water and Fire Water.Please provide some technical literature on that.
WHICH IS HARD MATERIAL CAST IRON OR MILD STEEL?
Why do you want do MS in Mechanical Engineering in US
How many type's of bearings.
function of damper
what is jdbc bridge?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)