Answer / karthikeyan
"Load Factor" is an indicator of how steady an electrical
load is over time.
If your electric billing rate includes both an Energy (kWh)
and Demand (kW) charge, your load factor can be calculated
by the following formula:
L.F. (percent) = [(Total kWh)/(# Days in Bill Cycle x 24
hrs/day)]/[Peak kW Demand]
If your load factor is low, you should look for ways to
even out your electrical usage (i.e., shift energy
intensive processes to periods of otherwise low usage).
By increasing load factor, you will reduce the impact of
monthly demand (kW) charges on your bill.
LF = average demand / peak demand
for a given period of time.
Is This Answer Correct ? | 15 Yes | 9 No |
DOES IS 2062 SPECIFIES ONLY SEAMLESS PIPES OR ERW PIPE IS ALSO COVERED UNDER IS 2062
why are you looking for job change?
how bricks are consumed one cubic metre
Tell us how do you discharge your duties in your duty post
0 Answers IES, Power Plant, Tata Teleservices,
if you say any object having a certain mass must be on the surface of the earth due to gravity, but how come gas molecules even after having a certain mass in atm. temperature and pressure not able to stay on ground.
What are the things needed to have an efficient boiler burning?
0 Answers ABC Inc, RRB, Siemens,
What is the reason behind having a vertical exhaust system in a tractor????
What is difference between torque and moment???
What is coefficient expansion of transformer oil?
What i the role of a turning gear attached to a shaft line of a steam turbine
tansen was singer in whose mugal emperor
What causes cylinder liner-wear down?