how can I find out a sulfuric acid recovery plant disigner?
No Answer is Posted For this Question
Be the First to Post Answer
What is a cstr and what are its basic assumptions?
how to design a heat exchanger?
Explain the some guidelines for sizing a psv for a fire scenario on a vessel in a refinery service?
how much maximum power can be generated by 320v, 10kg-cm synchronus motor if shaft is roteted mechanically at 50 to 60 rpm?
What are the reasons of removal of particles from effluent gas?
QUANTUM COMPUTING - EXAMPLE 32.3 : A system of linear congruences consists of 3 equations : X ≡ 1 (mod 3), X ≡ 3 (mod 5), X ≡ 4 (mod 6). X has positive values. (a) List the values of these equations from 1 to 35. Then find the minimum value of X. (b)(i) Find the least common multiple (LCM) of b = 3, 5 and 6 where X ≡ a (mod b). (ii) If b - a has the same value of all equations above, then X + (b - a) is divisible by LCM. Find the value of minimum value of X via LCM division.
How can I treat a waste stream containing both hexavalent chromium and arsenic?
Do you have recombinant protein expression experience? Explain?
Is it ever advantageous to use shells in series even though it may not be necessary?
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.20 : Assume an engineer buys a $1 bond in period T while the nominal interest rate is R. The inflation rate at T + 1 is anticipated to be I. (a) If the bond is redeemed in period T + 1, how much money will the buyer engineer receive, in term of R, which is not affected by inflation? (b) Find the present value, PV of the proceeds from the bond, in term of R and I. (c) If the bond is redeemed in period T + 1, calculate the real growth or real value of the money that the buyer engineer will receive, in term of r = real interest rate, which is affected by inflation. (d) From the answers in (b) and (c), find the values of x, y and z in the following Fisher equation : (1 + x) = (1 + y) / (1 + z), in term of r, R and I.
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.27 : A biochemical engineering consultancy applies construction accounting in its finance. Its project began on 1 January 2010. Total revenue generated from the project was $9000. On 1 January 2011 as the budget, $2000 had been spent, with $6000 expected. However, the project cost increased latter, causing deviation from its initial budget on 1 January 2012, where $7000 had been spent, with $1400 expected. Let (estimated total cost) = (spent cost) + (expected cost to be spent), (percentage completion) = 100 (spent cost) / (estimated total costs), (total expected profits) = (total revenue) - (estimated total costs). Calculate : (a) total expected profits on 1 January 2011 and 1 January 2012; (b) estimated total cost as and not as the budget; (c) percentage completion of the project since the project began, in the first and second years.
For amonia manufacturing process if pressure, temperature would be increase over optimum level what would be happen?And what steps should be taken?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)