Double Busbar Scheme for outdoor switch yard system (132kv) step up power plant Hi friends 1. in this system both busbars energized all the time. 2. what is the meaning of main BB and transfer BB, 3. step up transformer connect main bus bar all the time or both BB connected through DS switch . 4.bus sectionalization means ? thank you.
1 3174Post New Gael Electrical Engineering Interview Questions
How do I download windows 10 on my mac?
During execution of Works Contract,If Contractee(Customer) supply goods to contractor, then it should be shown in Invoice as deduction or no need to show in Invoice.
Which is the mammal that can differentiate between different colors?
while preparing insolvency account deficiency account is wich account? why we do not prepare it with general rules?
Tell me about user acceptance testing?
how to create a table index in mysql? : Sql dba
When designing advertising banners, is there a size used on the internet?
How do you check if an arraylist is empty?
11 kg trivevter meter has rating of -/5amps. And pt ratio11000/110v and is connected with 11kv ct/pt unit of cr ratio 75/5amps. And pt ratio of 11000/110v while checking accuracy of meter with HT Accuchek meter what value of PT ratio and CT ratio to be filled in Accuchek meter
What is the difference between a release version and snapshot version in maven?
what is program counter?
what is defination of conductivity? How much conductivity of water ? what is effect when conductity of water low or high?
Give the syntax of job specifying jcl statement.
How to use "in out" parameter properly?
what are the different methods to access seu?