Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

bsmcpl Interview Questions
Questions Answers Views Company eMail

for solid cement brick without fly ash,we use dust,6mm,12 mm jelly,water my question is what Proportion we mix dust,6mm,12 mm jelly,water ? for good strength brick.

1 2574

How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?

1567

i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible. 

1423

Post New bsmcpl Interview Questions




Un-Answered Questions

create a job that splits the data in the Jobs.txt file into four output files. You will direct the data to the different output files using constraints. • Job name: JobLevels • Source file: Jobs.txt • Target file 1: LowLevelJobs.txt − min_lvl between 0 and 25 inclusive. − Same column types and headings as Jobs.txt. − Include column names in the first line of the output file. − Job description column should be preceded by the string “Job Title:” and embedded within square brackets. For example, if the job description is “Designer”, the derived value is: “Job Title: [Designer]”. • Target file 2: MidLevelJobs.txt − min_lvl between 26 and 100 inclusive. − Same format and derivations as Target file 1. • Target file 3: HighLevelJobs.txt − min_lvl between 101 and 500 inclusive. − Same format and derivations as Target file 1. • Rejects file: JobRejects.txt − min_lvl is out of range, i.e., below 0 or above 500. − This file has only two columns: job_id and reject_desc. − reject_desc is a variable-length text field, maximum length 100. It should contain a string of the form: “Level out of range: ”, where is the value in the min_lvl field. My Question is how do you write the stage variable for reject rows.

2205


What is tinker in laravel?

427


i need to now what will be the cable size to the following load, transformer to distribution panel distance 110m, load 1000kw, voltage 400v, pf 0.85, permissible voltage drop 2.0%, overhead line, atmospheric temperature 35 degree c.

1195


what is boxing and unboxing?can we initialize unboxing directly?

511


What are model wage types?

535






What is a benefit of using a style sheet?

345


What are the tasks you have handled daily as an operation manager?

523


Which object encapsulates state or data of a user?

635


What is a page margin?

292


Is java part of oracle?

482


What hibernate save returns?

188


What is stateless in java?

504


-------------What is Coditional Prompting?

1601


What is the procedure to become charted accountant in India now. Please answer this is urgent

1064


please send me oracle pl/sql exp resume. and also faqs...

2047