With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
2462I am called for interview from north east power plant .so, I need some interview question which may help me.
1796Post New Power Plant Civil Engineering Interview Questions
Can I put windows 10 on an old computer?
1. 101 vinay hyderabad 123 naresh usa 152 singh delhi 101 vinay usa 123 naresh mumbai 156 raju chennai From the above data we need to retrive current data in a report ? how and explain in detail ?
How do I exit turbo c++?
What is the method to save data in stack data structure type?
Tell me what are pros and cons of automating tests at ui layer?
How do I run python on linux?
Explain the difference between association, aggregation and inheritance relationships.
what is the difference bet 4 wire transmiiters and 2 wire transmitters
What is using namespace std in c++?
How to display custom field value in page?
Why do you banking as a career?
What are the protection features of ms access?
Explain work process. What are the various work processes of r/3 system?
Why you use backbone.js, not other frameworks?
What do the master class and the output class do?