Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

ZCL Electrical Engineering Interview Questions
Questions Answers Views Company eMail

If a HV Underground Cable (13.8KV) is layed in the ground below 1.5 Mtrs and any building construction is done on the Cable route. IS this allowable or Not? What should be the clearance. As per ISO construction on HV cable route is safe or Not? Why? Can any body suggest the site for my question?

1 2103

Post New ZCL Electrical Engineering Interview Questions


ZCL Electrical Engineering Interview Questions


Un-Answered Questions

What is seo and its benefits?

462


what is the challenging position faced in the testing not in point of management point of view it must be in the point of while testing the application?

4038


What initial procedures need to undertake when a patient is seated in front of the doctor as a dental assistant?

457


Explain the difference between clustered and non-clustered index?

546


How do I quit mysql?

492






Explain the difference between size and length of jquery?

522


1))why we run three phase or three different circuit from a single conduit 2)) why not two circuit of different phase run in same conduit?? and why we run same three cicuit of same phae run in single conduit??

1927


What is multiversion two phase locking?

410


Your procurement department has obtained independent estimates. The vendor's proposal is substantially different than the independent estimates. All of the following are true except: A. The SOW was not detailed enough. B. The vendor failed to respond according to the terms of the proposal. C. The vendor failed to respond to all items in the SOW. D. The vendor failed to respond to all items in the contract.

611


List the operator used in Perl?

546


What are the features of presto?

5


Does linux mint use gnome?

453


What is difference between json and bson?

1


Why python is popular now?

446


What is liabilities and what all does include in current liabilities?

628