how the CT and PT is connected in the circuit during testing of transformer explain with diagram
2028What is the maximum allowed kwa through 2.5mm cable. Electric company installed 2 electric meter at my premises . Two jumper wires of 2.5 mm are used to connect . 2 single phase meters with allowable load 6 and 3 kwa. These jumper wires are taken from a 3 phase electric meter. Meters are in open Sun. What max load these wires can take.
2175Post New KESC Interview Questions
Explain how you can deploy a custom build of a core plugin?
Can one chart of accounts be assigned to several company codes?
why are you choose sap fi/co
Explain the purpose of the open() and close() operations.
How long is a page and a half?
What is the shortcut to insert a table in word?
Why main() method is public, static and void in java ?
How is the vendor created?
How do I open a cab file?
What is summary index in Splunk?
in power generator normaly voltagr betwween esth to neutral is 0 but my work place generator show the volatge is 60v any body know why? thanks
Explain the various components used in creating digital circuits?
What are classes in c#?
Use of an integrity constraint is better to validate data. Explain
Why does for update in oracle 8 cause an ora-01002 error?