You have a bag with 6 marbles. One marble is white. You reach the bag 100 times. After taking out a marble, it is placed back in the bag. What is the probability of drawing a white marble at least once?
313Post New Microsoft Data Science Interview Questions
What is the difference between functions getch() and getche()?
I need a MATLAB source code to recognize different regular geometric shapes such as: squares,rectangles,triangles,circles and ellipses in different sizes using neural network. All of the images containing these shapes should be in binary format with the size of 300*400 pixels. would you please give me a MATLAB code to detect these geometric shapes?
If the user's operating system does not support the needed character, how can the symbol be represented?
How will non-supporting browsers handle dhtml?
How much ram is required for python?
transformer spections :: input voltage 0-110-230v; output volage 0-10-12-14v; amp=3A using CRNO CORE, capcaity=50VA primary turns = ? ; secondry turns =?
What is the tcp/ip port on which sql server runs?
You are a project manager for a growing dairy farm. They offer their organic dairy products regionally and are expanding their operations to the West Coast. They're in the process of purchasing and leasing dairy farms to get operations under way. You are in charge of the network operations part of this project. An important deadline is approaching that depends on the successful completion of the testing phase. You've detected some problems with your hardware in the testing phase and discover that the hardware is not compatible with other network equipment. You take corrective action and exchange the hardware for more compatible equipment. Which of the following is true? A. This is not a corrective action involves human resources, not project resources. B. Corrective action is taken here to make sure the future project outcomes are aligned with the project plan. C. Corrective action is not necessary in this case as the future project outcomes aren't affected. D. Corrective action serves as the change request to authorize exchanging the equipment.
Safety of on line ups
i paid tds through my bank account but i entered the assessment year as 2010-11(the current year) instead of 2011-12(actual assessment year). what is the remedy for this. how do i get refund for the wrongly paid sum. or is there any way to currect the assessment year?
Write a program to model an exploding firecracker in the xy plane using a particle system.
what do you mean by the accumulated depreciation?
What is scope & storage allocation of static, local and register variables? Explain with an example.
How to operate a ac chilar plant?
Tell us what is seam finish?