Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

FEWA Electrical Engineering Interview Questions
Questions Answers Views Company eMail

Dear all i want to know FEWA Electrical Supervisor Licence test Previous Year Questions ? If any body know please send to me shibin_75@yahoo.com

1 14177

Make a list of materials and layout diagram for a 35hp motor, to be wired at 35meter away from the MDB in a chemical factory.

2 4615

Draw SLD for a panel has 500A Bus Bar rating, with 4 outgoing, each is 80 A (load current), showing the transformer and capacitor bank rating.

1667

Draw SLD feeding from the SS up to distribution board of the load, calculate cable size, breaker sizes, and meter for the following case: Ground Floor: electric room, pump room, 5 shops, each is 15 KW First Floor: 5 shops, each is 15 KW Second Floor: showroom 30 KW Service Loads: water pump 3 KW (3ph) , fire pump 3 KW (3ph), and one DB service 12 KW (3ph).

2037

Draw an S.L.D of the main panel for a hospital, showing meter position. Essential loads are: 1) Equipment load 100 KW 2) Critical load 500 KW 3) Life AID Safety load 400 KW 4) NON-Essential load 200 KW 5) Other service loads 200 KW Calculate and suggest the size of the transformer, size of main cable, capacitor bank, and calculate the capacity of an emergency load having above first three mentioned loads is supplied by an emergency generator.

2005

Post New FEWA Electrical Engineering Interview Questions


FEWA Electrical Engineering Interview Questions
    FEWA Electrical Engineering Interview Questions (5)


Un-Answered Questions

What is year end closing? How do you perform a carry forward commitment? : cost center accounting

1113


How vpn is used in the corporate world?

417


How to set layout’s attribute programmatically in android?

947


Which one is faster ienumerable or iqueryable?

945


How much diesel does 1000 kva rating dg set at full load consume?

1031


Can AI systems ever be completely free of bias? Why or why not?

1


What does the mev in mev photon mean?

1034


What is "per session" instance mode in wcf?

930


Describe implicit attribute?

1022


What is the example of procedure?

933


what is cyclon vibration effect in turbine

2059


What is sap product life cycle management?

910


what is your career aspect & if they asked in general what should i answer?

2313


What are the general requirements of rpa for front and back office processing?

1


Does RSA help detect altered documents and transmission errors?

927