What are the core application components available on yii?
Is a copy constructor?
UFT 12.02 which ALM version will support
What is datamining concept ?
define risk management system with example ?
How many threads can you run?
Where the command line arguments are stored and if you want to read command-line arguments with Perl, how would you do that?
What are the limitations when serving XHTML pages?
What are the types of labels?
What are the different authentication modes in sql server?
What is inverse definite minimum time lag relay? Where is it use?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
How to restore deleted OU in DC ?
How can I make a powerful presentation?
Would your rather work with information or with people?